COMPREHENSIVE TEST PLAN
1 Pressure Test » Apply 5 LBs/Inch2 Pressure for 1 Hour
Observation - no leaks to exist.
2 Measurements of IR Values » WI/INS/01

IR Values shall be

HV - LV = above 500 M Ohms.

HV - E =above 500 M Ohms.

LV - E =above 500 M Ohms.
3 Measurement of Turns Ratio » WI/INS/02
4 Vector Group Identification » WI/INS/03
5 Measurement of Dielectric Strength of oil » WI/INS/04
6 Winding Resistance » WI/INS/05
7 Open Circuit Test » WI/INS/06
8 Short Circuit Test » WI/INS/07
9 Separate Source Voltage Test » WI/INS/08
10 Induced Over Voltage Test » WI/INS/09
11 Magnetic Balance Test » WI/INS/10
12 Zero Sequence Impedance Test » WI/INS/11
13 Type Tests if required by Customer shall be carried out at CPRI » N.A
NOTE: The above tests will be done as per IS : 2026 - 1977 and IS 335 - 1993.
 
  